U of L Campus Master Plan
Close
  • About
  • Planning History
    • Development Plan (1969)
    • Phase IV Report (1990)
    • Plan Review (1993)
    • Master Plan Report (2000)
    • Precinct Plan (2000)
    • Expansion Plan (2001)
    • Archival Gallery
  • Planning Process
    • Project Initiation
    • Planning Phases
  • UCMP (2012)
  • Contact
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Planning Process
  • Project Initiation
    • RFP-Qu Detailed Information
      • Project Summary
        • Overall Objectives
        • Consulting Services
      • Project Scope
        • Specific Planning Objectives
        • Proposed Process & Timelines
        • Deliverables
        • Supplemental RFP Material
        • Existing Campus Plan
        • Planning Liaisons
        • Approvals
        • Environmental Sustainability
        • Relevant Studies & Reports
          • Additional Relevant Planning Studies & Reports
        • Strategic Plan Synergies
        • Key Development Concerns
      • Scope of Services
      • Project Organization
  • Planning Phases
    • Phase 1
    • Phase 2
      • Leadership Interviews
      • World Cafe
        • Delegates
      • Whiteboard/Facebook Forum
        • Question 1
        • Question 2
        • Question 3
        • Question 4
        • Question 5
        • Question 6
      • Life Balance Fair
    • Phase 3
      • Master Plan Directions Report (ECS)
        • Direction A: "Comprehensive"
        • Direction B: "Destination"
        • Direction C: "Leadership"
        • Summary of Findings
          • Graduate Education and Research
          • Liberal Education
          • A Destination Campus
          • Outlook for the Faculties
          • One Campus, Many Experiences
          • Student Services
          • Library, Learning Commons
          • Student Hub / Student Life
          • Residences
          • Campus Heritage
          • Social Spaces
          • Parking and Transit
          • Campus Organization
          • Connection to Community
    • Phase 4
      • Context of Plan Alternatives
      • Precedent Buildings & Landscapes
      • Iterative Planning Concepts
        • Early Planning Charrettes
        • Toward Three Conceptual Plans
          • UCMP Option A
          • UCMP Option B
          • UCMP Option C
          • Evaluation of Three Concepts
        • Two Planning Futures
      • Open House I
        • Presentation Boards
    • Phase 5
    • Phase 6 (In Conclusion)
      • Celebratory Public Open House

Phase 4 (In Progress)

Conceptual Design Alternatives Development

The planning process and results of the conceptual planning stage will be chronicled in the following web pages. The general project plan of this phase is explained below.

During the initial months of 2012, the consultant planning team will develop early concepts for the master plan. Incremental variations of each design plan alternative will be reviewed and synthesized through a series of collaborative work sessions involving Campus Planning & Architecture representatives and the consultant planning team of architects. These early studies will initially distill into three (3) distinct campus design alternatives or options and be presented to the master plan leadership including key Senior Administrators in mid March. The merits of each conceptual option will be discussed in reference to the established planning objectives. Independent evaluations of each option are also to be performed by the master plan leadership team and this feedback weighed in turn by the consultant team.

The conceptual development of the three initial plan options will continue in subsequent months with the intent of arriving at a single complete vision. The early months of summer will advance the conceptual planning stage and further solidify the three conceptual options into two distinct options for additional debate and critique in May. Following this, the two concepts will be directed into one final preferred direction on a step by step course to advance the Campus Master Plan into a single formatted draft version of the University Campus Master Plan (2012).

Image

Above: Using 3-D modelling software, a quick study model reveals design possiblities around Aperture Loop and adjacent buildings. This early concept includes a gateway to a north and south 'coulee domain' and illustrates a potential occupiable bridge connection over the south coulee to an expanding residential community south of the central campus spine of Aperture Drive.

Students

  • Academic calendar
  • Student Enrolment and Registrar Services
  • Student opportunities
  • Student services
  • Study here

Information for

  • Alumni
  • Donors
  • Visitors and community

Campus

  • Careers at uLethbridge
  • Events
  • Faculty and staff intranet
  • Maps and tours
  • News
Visit the University of Lethbridge Homepage
  • Lethbridge, Alberta, Canada
  • Contact us
  • Calgary Campus
  • Faculty and staff directory

The University is located on traditional Blackfoot Confederacy territory. We honour the Blackfoot people and their traditional ways of knowing in caring for this land, as well as all Aboriginal peoples who have helped shape and continue to strengthen our University community.

©2025 University of Lethbridge | Terms of use