Skip to main content
Welcome to the University of Lethbridge
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
U of L Campus Master Plan
Close
  • About
  • Planning History
    • Development Plan (1969)
    • Phase IV Report (1990)
    • Plan Review (1993)
    • Master Plan Report (2000)
    • Precinct Plan (2000)
    • Expansion Plan (2001)
    • Archival Gallery
  • Planning Process
    • Project Initiation
    • Planning Phases
  • UCMP (2012)
  • Contact
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Planning History
  • Development Plan (1969)
    • The Vision
    • Planning Models
    • Objectives
    • Goals
    • Site Parameters
      • Environmental Data
      • Topography and Vegative Cover
      • Soils
      • Prairie Landscape
    • Planning Objectives
    • The Development Plan
      • Land Use
      • Circulation
      • Form and Massing
      • Landscape
      • Academic Area
    • Implementation
    • Accolades
  • Phase IV Report (1990)
    • Design Goals
    • Long Range Plan
    • Analysis of Plan Options
  • Plan Review (1993)
    • Development Guidelines
    • Campus Development 1969-1993
    • Current Issues
    • Strategy for Future Development
    • Recommended Development
      • Site A - South Coulee
      • Site B - West Ridge
      • Site C - North University Hall
  • Master Plan Report (2000)
    • Modified Anderson Hall Model
    • Key Development Guidelines
    • Site Development Strategy
    • Master Plan Directions
      • Site Plan
      • Site Topography
      • Landscape Plan
      • Pedestrian Routes
      • Vehicular Routes
      • Future Projects
      • Precinct Plans
  • Precinct Plan (2000)
    • Master Plan Report (2000)
    • Precinct Plans
    • Conceptual Design Guidelines
    • Project/Master Plan Reviews
    • Life Sciences Building
  • Expansion Plan (2001)
    • Key Findings
    • Campus Vision
    • Campus Design Concepts
      • Phase 1
      • Phase 2
  • Archival Gallery

Development Guidelines

The key development guidelines contained in the Campus Development Plan Review report were summarized as follows:

  1. West Ridge Site be developed fo the Library and future proposed associated functions such as conference facility/central kitchens
  2. Library incorporate an identifiable appropriately scaled entrance to the University
  3. Excavations on this ridge be very carefully controlled due to the unique soil characteristics
  4. South Coulee site be reserved for Science expansion
  5. Prior to or simultaneous with Science expansion, a parking structure be incorporated with an appropraite drop point and entrance directly into the Theatre Lobby at Level 5
  6. North extensions (Block F) of University Hall not be considered at this time
  7. East-west component at the north end of University Hall not be considered at all
  8. West campus boundary zone be held in reserve and not developed for botanical uses at this time

Students

  • Academic calendar
  • Student Enrolment and Registrar Services
  • Student opportunities
  • Student services
  • Study here

Information for

  • Alumni
  • Donors
  • Visitors and community

Campus

  • Careers at uLethbridge
  • Events
  • Faculty and staff intranet
  • Maps and tours
  • News
Visit the University of Lethbridge Homepage
  • Lethbridge, Alberta, Canada
  • Contact us
  • Calgary Campus
  • Faculty and staff directory

The University is located on traditional Blackfoot Confederacy territory. We honour the Blackfoot people and their traditional ways of knowing in caring for this land, as well as all Aboriginal peoples who have helped shape and continue to strengthen our University community.

©2025 University of Lethbridge | Terms of use