Skip to main content
Welcome to the University of Lethbridge
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Facilities: Building Maintenance
Close
  • About
  • Services
    • Building Maintenance Operation
    • Architectual Commissioning
    • Carpentry
    • Distribution of Goods
    • Door & Lock Systems
    • Event Set-ups
    • Furniture Replacement
    • Paint Shop
    • Sign Shop
  • Resources
    • Health & Safety Manuals
    • Design & Construction Standards
  • Contact
    • Profiles
    • Urgent Work Requests
    • Work Requests
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Resources
  • Health & Safety Manuals
    • Safe Work Procedures
      • Carpenter Shop
        • Glass or Mirror Cutting
        • Wood, Metal, Plastic Cutting
      • Locksmith Shop
        • Door Installation
        • Glass Removal & Replacement
        • Glass or Mirror Cutting
        • Window Installation
      • Paint Shop
        • Airless Sprayer
        • Furniture Finishing
        • Patching
        • Wood, Metal, Plastic Cutting
      • Sign Shop
        • Sign Hanging
      • Appendix A
        • Bandsaw
        • Chop Saw
        • Circular Table Saw
        • Cleaning Solvents & Flammables
        • Compressed Air
        • Compressed Gas Cylinders
        • Defective Tools
        • Disk Sander
        • Drill Press
        • Electrical Extension Cords
        • Electrical Safety
        • Explosive/Powder Actuated Fastening Tools
        • Fire & Fire Extinguishers
        • Flammable & Toxic Materials
        • Forklift Operation
        • Grinding
        • Hand Held Power Circular Saw
        • Hand Held Power Tools
        • Hand Powered Lifts, Roustabouts & Hyjacks
        • Hantavirus
        • Housekeeping
        • Insect Repellents
        • Jointer
        • Metal Scaffolds
        • Mobile Aerial Work Platform
        • Mosquitoes/West Nile Virus
        • Non-Powered Hand Tools
        • Overhead Doors
        • Oxygen-Acetylene or Oxygen-Propane Torch
        • Personal Headphones
        • Portable Arc Welder
        • Portable Grinders
        • Portable Ladders
        • Power Washer
        • Propane
        • Proper Lifting Techniques
        • Reporting Rattlesnakes
        • Rotating Emergency Flashing Warning
        • Shaper/Router
        • Step Ladders
        • Tiger Torches
        • Welding, Cutting & Burning
    • Download Full Manuals
  • Design & Construction Standards
    • Performance Requirements
      • Substructure Performance
      • Shell Performance
      • Interior Performance
    • Life Cycle Activities
      • Commissioning
      • Facility Maintenance
    • Existing Conditions
      • Concrete
      • Thermal/Moisture
      • Openings
      • Specialty Doors/Frames
      • Finishes
      • Specialties
      • Information Specialties
      • Interior Specialties
      • Equipment
      • Furnishings
      • Conveying Equipment
      • Fire Suppression
      • Plumbing
      • Sanitary Sewerage
      • Plumbing Fixtures
      • Heating/Ventilating/Air-Conditioning

Glass Removal & Replacement

Safe Work Procedures - Window Installation

General/Brief Description of task Installation of glass or mirrors, as either a replacement or new
Frequency of task performed On demand
Hazards Identified #1 – Falling Objects
#8 – Eye Injury
#10 – Lifting
#15 - Cuts
P.P.E. required: Special tools required (if any)
  • Safety Glasses
  • Gloves
  • Suction cup
Safe Work Procedure
  • Inspect immediate area for any existing or potential hazards before starting the job
  • Refer to Safe Work Practices on “Defective Tools”, “Use of Non-Powered Hand Tools”, “Use of Power Tools”, “Use of Electrical Extension Cords”, and “Electrical Safety”.
  • Cover broken glass with cardboard until replacement comes in. If glass is completely broken, remove and replace with plywood.
  • Always wear gloves when removing old glass.
  • If broken glass is elevated and badly shattered safety glasses should be worn.
  • Take proper care when lifting new glass into place. Units that are larger than 3’ x 3’ square, will usually require 2 people to lift.
  • Refer to Safe Work Practices on “Proper Lifting Techniques” as found in Appendix ‘A’
  • Larger units can be better handled and set into place by the use of suction cup and an assistant.
  • Windows damaged above walkways will require barricades and warning tape to safely rope off area while work is taking place, to prevent falling objects from injuring passersby.
  • Refer to Safe Work Practices on “Use of Portable Ladders” and “Use of Step Ladders” as found in Appendix ‘A’.

Download Glass Removal & Replacement Safe Work Procedures Reference Sheet.pdf


Students

  • Academic calendar
  • Student Enrolment and Registrar Services
  • Student opportunities
  • Student services
  • Study here

Information for

  • Alumni
  • Donors
  • Visitors and community

Campus

  • Careers at uLethbridge
  • Events
  • Faculty and staff intranet
  • Maps and tours
  • News
Visit the University of Lethbridge Homepage
  • Lethbridge, Alberta, Canada
  • Contact us
  • Calgary Campus
  • Faculty and staff directory

The University is located on traditional Blackfoot Confederacy territory. We honour the Blackfoot people and their traditional ways of knowing in caring for this land, as well as all Aboriginal peoples who have helped shape and continue to strengthen our University community.

©2025 University of Lethbridge | Terms of use