Skip to main content
Welcome to the University of Lethbridge
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Facilities: Building Maintenance
Close
  • About
  • Services
    • Building Maintenance Operation
    • Architectual Commissioning
    • Carpentry
    • Distribution of Goods
    • Door & Lock Systems
    • Event Set-ups
    • Furniture Replacement
    • Paint Shop
    • Sign Shop
  • Resources
    • Health & Safety Manuals
    • Design & Construction Standards
  • Contact
    • Profiles
    • Urgent Work Requests
    • Work Requests
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Resources
  • Health & Safety Manuals
    • Safe Work Procedures
      • Carpenter Shop
        • Glass or Mirror Cutting
        • Wood, Metal, Plastic Cutting
      • Locksmith Shop
        • Door Installation
        • Glass Removal & Replacement
        • Glass or Mirror Cutting
        • Window Installation
      • Paint Shop
        • Airless Sprayer
        • Furniture Finishing
        • Patching
        • Wood, Metal, Plastic Cutting
      • Sign Shop
        • Sign Hanging
      • Appendix A
        • Bandsaw
        • Chop Saw
        • Circular Table Saw
        • Cleaning Solvents & Flammables
        • Compressed Air
        • Compressed Gas Cylinders
        • Defective Tools
        • Disk Sander
        • Drill Press
        • Electrical Extension Cords
        • Electrical Safety
        • Explosive/Powder Actuated Fastening Tools
        • Fire & Fire Extinguishers
        • Flammable & Toxic Materials
        • Forklift Operation
        • Grinding
        • Hand Held Power Circular Saw
        • Hand Held Power Tools
        • Hand Powered Lifts, Roustabouts & Hyjacks
        • Hantavirus
        • Housekeeping
        • Insect Repellents
        • Jointer
        • Metal Scaffolds
        • Mobile Aerial Work Platform
        • Mosquitoes/West Nile Virus
        • Non-Powered Hand Tools
        • Overhead Doors
        • Oxygen-Acetylene or Oxygen-Propane Torch
        • Personal Headphones
        • Portable Arc Welder
        • Portable Grinders
        • Portable Ladders
        • Power Washer
        • Propane
        • Proper Lifting Techniques
        • Reporting Rattlesnakes
        • Rotating Emergency Flashing Warning
        • Shaper/Router
        • Step Ladders
        • Tiger Torches
        • Welding, Cutting & Burning
    • Download Full Manuals
  • Design & Construction Standards
    • Performance Requirements
      • Substructure Performance
      • Shell Performance
      • Interior Performance
    • Life Cycle Activities
      • Commissioning
      • Facility Maintenance
    • Existing Conditions
      • Concrete
      • Thermal/Moisture
      • Openings
      • Specialty Doors/Frames
      • Finishes
      • Specialties
      • Information Specialties
      • Interior Specialties
      • Equipment
      • Furnishings
      • Conveying Equipment
      • Fire Suppression
      • Plumbing
      • Sanitary Sewerage
      • Plumbing Fixtures
      • Heating/Ventilating/Air-Conditioning

Sign Hanging

Safe Work Procedures - Sign Hanging

General/Brief Description of task Hanging of signs throughout campus buildings
Frequency of task performed On demand
Hazards Identified #1 – Falling Objects
#7 – Noise
#11 – Slips / Falls
P.P.E. required: Special tools required (if any)
  • Hearing Protection
  • Step Ladder
  • 2 Way Tape
  • Silicone
  • Cordless Drill
  • Screws
  • Pliers
  • Bolt Cutters
  • Razors
  • Hilti Hammer Drill,
  • Stud Finder
  • Isopropyl Alcohol
  • Rapid Remover
Safe Work Procedure
  • Visually inspect area for possible hazards

Wall Mounted Signs

  • If sign is an upgrade or change, remove old sign first
  • Using Stud Finder, check wall for position to hang sign
  • If sign is to be hung in a specific location where no stud exists, anchors must be used
  • Depending on size of sign and surface of wall, sign may be attached by double sided tape, screws, or silicone
  • If drilling into concrete, a hammer drill is used and safety glasses and hearing protection must be worn
  • If sign is too large in size or too heavy, obtain help to hold sign while anchoring to wall
  • Refer to Safe Work Practice for “Proper Lifting Techniques” as found in Appendix ‘A’

Ceiling Hung Signs

  • Place pylons around base of ladder to divert traffic away from work area, preventing injury to passersby due to falling objects
  • Using cordless drill, make holes in T-Bar slats (suspended ceiling)
  • If hanging from a concrete beam, a Hilti Hammer Drill is used and safety glasses and hearing protection must be worn
  • Insert metal eye hooks
  • Using bolt cutters, cut chain to length and attach to sign and eye hooks
  • Refer to Safe Work Practices for “Use of Step Ladders” as found in Appendix ‘A’
  • Refer to Safe Work Practices for “Use of Power Tools” as found in Appendix ‘A’
  • If sign is too large in size or too heavy, obtain help to hold sign while suspending from ceiling
  • Refer to Safe Work Practice for “Proper Lifting Techniques” as found in Appendix ‘A’

Download Sign Hanging Safe Work Procedure Reference Sheet.pdf

Students

  • Academic calendar
  • Student Enrolment and Registrar Services
  • Student opportunities
  • Student services
  • Study here

Information for

  • Alumni
  • Donors
  • Visitors and community

Campus

  • Careers at uLethbridge
  • Events
  • Faculty and staff intranet
  • Maps and tours
  • News
Visit the University of Lethbridge Homepage
  • Lethbridge, Alberta, Canada
  • Contact us
  • Calgary Campus
  • Faculty and staff directory

The University is located on traditional Blackfoot Confederacy territory. We honour the Blackfoot people and their traditional ways of knowing in caring for this land, as well as all Aboriginal peoples who have helped shape and continue to strengthen our University community.

©2025 University of Lethbridge | Terms of use