Skip to main content
Welcome to the University of Lethbridge
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Facilities: Building Maintenance
Close
  • About
  • Services
    • Building Maintenance Operation
    • Architectual Commissioning
    • Carpentry
    • Distribution of Goods
    • Door & Lock Systems
    • Event Set-ups
    • Furniture Replacement
    • Paint Shop
    • Sign Shop
  • Resources
    • Health & Safety Manuals
    • Design & Construction Standards
  • Contact
    • Profiles
    • Urgent Work Requests
    • Work Requests
  • Library
  • Directory
  • Intranet
  • MyExperience
  • Webmail
  • Bridge
  • Moodle
Study here Give
Resources
  • Health & Safety Manuals
    • Safe Work Procedures
      • Carpenter Shop
        • Glass or Mirror Cutting
        • Wood, Metal, Plastic Cutting
      • Locksmith Shop
        • Door Installation
        • Glass Removal & Replacement
        • Glass or Mirror Cutting
        • Window Installation
      • Paint Shop
        • Airless Sprayer
        • Furniture Finishing
        • Patching
        • Wood, Metal, Plastic Cutting
      • Sign Shop
        • Sign Hanging
      • Appendix A
        • Bandsaw
        • Chop Saw
        • Circular Table Saw
        • Cleaning Solvents & Flammables
        • Compressed Air
        • Compressed Gas Cylinders
        • Defective Tools
        • Disk Sander
        • Drill Press
        • Electrical Extension Cords
        • Electrical Safety
        • Explosive/Powder Actuated Fastening Tools
        • Fire & Fire Extinguishers
        • Flammable & Toxic Materials
        • Forklift Operation
        • Grinding
        • Hand Held Power Circular Saw
        • Hand Held Power Tools
        • Hand Powered Lifts, Roustabouts & Hyjacks
        • Hantavirus
        • Housekeeping
        • Insect Repellents
        • Jointer
        • Metal Scaffolds
        • Mobile Aerial Work Platform
        • Mosquitoes/West Nile Virus
        • Non-Powered Hand Tools
        • Overhead Doors
        • Oxygen-Acetylene or Oxygen-Propane Torch
        • Personal Headphones
        • Portable Arc Welder
        • Portable Grinders
        • Portable Ladders
        • Power Washer
        • Propane
        • Proper Lifting Techniques
        • Reporting Rattlesnakes
        • Rotating Emergency Flashing Warning
        • Shaper/Router
        • Step Ladders
        • Tiger Torches
        • Welding, Cutting & Burning
    • Download Full Manuals
  • Design & Construction Standards
    • Performance Requirements
      • Substructure Performance
      • Shell Performance
      • Interior Performance
    • Life Cycle Activities
      • Commissioning
      • Facility Maintenance
    • Existing Conditions
      • Concrete
      • Thermal/Moisture
      • Openings
      • Specialty Doors/Frames
      • Finishes
      • Specialties
      • Information Specialties
      • Interior Specialties
      • Equipment
      • Furnishings
      • Conveying Equipment
      • Fire Suppression
      • Plumbing
      • Sanitary Sewerage
      • Plumbing Fixtures
      • Heating/Ventilating/Air-Conditioning

Window Installation

Safe Work Procedures - Window Installation

General/Brief Description of task Installing windows in doors – (offices, classrooms, fire doors)
Frequency of task performed On demand.
Hazards Identified

#1 – Falling Objects
#7 – Noise
#8 – Eye Injury
#10 – Lifting
#15 – Cuts

P.P.E. required: Special tools required (if any)
  • Hearing Protection Skill Saw (Hand Held Power Circular Saw)
  • Safety Glasses
  • Skill Saw (Hand Held Power Circular Saw)
  • Hole Saw (& Power Drill)
  • Caulking Gun
Safe Work Procedure
  • Visually inspect worksite for any possible hazards
  • Remove door from hinges. Use caution when removing as not to drop it on feet. Obtain help if door is too heavy or awkward
  • If door has an existing window that just needs to be replaced, remove and replace broken glass.
  • Use extreme caution when handling broken glass. Gloves may be used
  • Safety Glasses must be worn
  • Insert new piece of tempered glass and secure using caulking or glazing
  • If no window exists and a new one needs to be put in, cut hole in door to size as per work order
  • Hearing protection and safety glasses are required when working with power saws
  • Install tempered glass and secure using caulking or glazing
  • Re-hang door on hinges
  • Refer to Safe Work Practice for “Use of Power Tools” as found in Appendix ‘A’
  • Refer to Safe Work Practice for “Use of Hand Held Power Circular Saw” as found in Appendix ‘A’
  • Refer to Safe Work
  • Refer to Safe Work Practice for “Proper Lifting Techniques” as found in Appendix ‘A’
  • Refer to SOP # BM1007 as found in this manual

Download Window Installation Safe Work Procedures Reference Sheet.pdf

Students

  • Academic calendar
  • Student Enrolment and Registrar Services
  • Student opportunities
  • Student services
  • Study here

Information for

  • Alumni
  • Donors
  • Visitors and community

Campus

  • Careers at uLethbridge
  • Events
  • Faculty and staff intranet
  • Maps and tours
  • News
Visit the University of Lethbridge Homepage
  • Lethbridge, Alberta, Canada
  • Contact us
  • Calgary Campus
  • Faculty and staff directory

The University is located on traditional Blackfoot Confederacy territory. We honour the Blackfoot people and their traditional ways of knowing in caring for this land, as well as all Aboriginal peoples who have helped shape and continue to strengthen our University community.

©2025 University of Lethbridge | Terms of use