Monday, May 29, 2017
This notice is from the archives of The Notice Board. Information contained in this notice was accurate at the time of publication but may no longer be so.
On June 6 a contractor will be on site to revise the existing dry sprinkler system to a wet system in the 4th Floor Students Union Building Mechanical Room SU4M1. This work will involve some transport of materials up the public stairwell from Level 2 to Level 3 on the south end of the Students Union Building and through the south entrance to the SU Building.
Contact:
Jason Shaughnessy | j.shaughnessy@uleth.ca | (403) 380-1816