This notice is from the archives of The Notice Board. Information contained in this notice was accurate at the time of publication but may no longer be so.
Contractors will be on campus on June 12th to carry out storm sewer flushing and inspection. The work will mainly be located in and around Lot H and I, and reas South of the Library. Some sections of footpath between UCA, the Library and Student Union buildings will also be closed for short periods of time while camera inspection of the storm drains is undertaken. Please obey barricades and signage during this work.
Thank you for your cooperation. Please contact Ed de Bruin, Project Manager (Facilities) for more information.
Contact:
Ed de Bruin | edwin.debruin@uleth.ca | (403) 380-1843